Port Inspection in Shanghai
for CCC Approved Products - 2009*
Till now, 88 batches of unqualified CCC Approved imported products have been found during the Port Inspection in Shanghai (2009). The non-conforming items include:
- CCC Mark (56 batches)
- Model and Specification (8 batches)
- Factory (4 batches)
- Critical components/construction (21 batches)
- Safety test (7 batches)
Total 26 batches were requested to be returned or destroyed. Other batches were required to be corrected in a time limit. For those products differed from that listed in the CCC Certificates, the findings were also informed to CQC accordingly.
* Published on CNCA website( 2009-07-01) .
|